Vehicle access ramps
Embedded heating can be planned into a ramp construction project. Its design must address traffic loading, pavement movement, water runoff and the intended winter operating conditions.
Building approaches
Heated walkways and entrance areas can support a winter access plan. Coordinate the heated route with doors, thresholds and the maintenance of adjacent untreated surfaces.
Outdoor stairways
Tread-specific surface heating addresses exposed stairs and landings. The specification should preserve usable tread area and account for transitions between heated and unheated sections.